Error message

  • User warning: The following module is missing from the file system: file_entity. For information about how to fix this, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /homepages/12/d495968781/htdocs/arenasing/includes/bootstrap.inc).
  • Notice: Undefined property: stdClass::$taxonomy_term_name in include() (line 68 of /homepages/12/d495968781/htdocs/arenasing/sites/all/themes/arenas2012/templates/views/views-view--proyectos--block-1.tpl.php).
  • Notice: Undefined property: stdClass::$taxonomy_term_name in include() (line 68 of /homepages/12/d495968781/htdocs/arenasing/sites/all/themes/arenas2012/templates/views/views-view--proyectos--block-1.tpl.php).
  • Notice: Undefined property: stdClass::$taxonomy_term_name in include() (line 68 of /homepages/12/d495968781/htdocs/arenasing/sites/all/themes/arenas2012/templates/views/views-view--proyectos--block-1.tpl.php).
  • Notice: Undefined property: stdClass::$taxonomy_term_name in include() (line 68 of /homepages/12/d495968781/htdocs/arenasing/sites/all/themes/arenas2012/templates/views/views-view--proyectos--block-1.tpl.php).
  • Notice: Undefined property: stdClass::$taxonomy_term_name in include() (line 68 of /homepages/12/d495968781/htdocs/arenasing/sites/all/themes/arenas2012/templates/views/views-view--proyectos--block-1.tpl.php).
  • Notice: Undefined property: stdClass::$taxonomy_term_name in include() (line 68 of /homepages/12/d495968781/htdocs/arenasing/sites/all/themes/arenas2012/templates/views/views-view--proyectos--block-1.tpl.php).
  • Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in _menu_load_objects() (line 579 of /homepages/12/d495968781/htdocs/arenasing/includes/menu.inc).
Betanzos Bridge
, , , , , , , , , , ,

DESCRIPCION

With a deck of 23 meters, this bridge accommodates 4 traffic lanes, a central band and two lateral emergency strips. This curved (R=740 m) bridge adopts a deck which is continuous along the entire length 1054 meters. The three central spans reach 150 meters between the axes of the V-shaped piers. The cross-section is a concrete central box girder of variable depth and lateral bands including precast concrete inclined struts. Internally, the box girder includes transverse frames spaced at 5 meters receiving the point load transmitted by the feet of the inclined struts. In addition, the walls are used as deviators for a set of external cables composing the continuity prestressing of each span.
The construction procedure consists of free cantilevering for the central spans and scaffolding for the side spans. In both cases, the lateral bands are erected after the box girder is finished and may be used as the provisional bridge from which the precast inclined struts are mounted.
 
 

In order to avoid excessive secondary forces due to curvature and imposed deformations, the bridge has been built with the two V shaped piers located far from the center provisionally supported on movable bearings. This detail was thought to allow the free movements of the deck by the effects of concrete creep and shrinkage, and conceived to be definitively blocked afterwards.

>>Full text >> Resume